GENERAL
SPECIFICATIONS OF CONSTRUCTION
MUTALOS
PROJECT-KATHIKAS
STRUCTURES AND WALLS
The building structures of all villas are constructed
with reinforced concrete. All external/internal walls and partitions are of
high quality hollow clay bricks, 200mm wide for external walls and 100mm
wide for the internal walls.
WALL FINISHES
The external walls are coated with three coats of
plaster and high quality paint finish.
On the internal walls, three coats of plaster are
applied in all rooms, except the WC and bathroom, in which quality finished
ceramic tiles are fitted. The surrounding work surfaces and wall units of
the kitchen shall also be tiled with high quality ceramics.
FLOOR FINISHES
Living/dining room, kitchen, bedrooms and bathrooms,
balconies, and verandahs shall be fitted with high quality Italian ceramic
tiles chosen by the owner . Basement with standard ceramic tiles will be
chosen by Vendor.
ELECTRICITY
The electricity is supplied from the Electricity
Authority of Cyprus (E. A. C.). Three double sockets will be fitted per
room as standard. TV and telephone points shall be installed in the living
room and all bedrooms. Provision for air conditioning hot and cold is
provided in the living room and all bedrooms.
CEILING FINISHES
Concrete roof throughout the villa.
CARPENTRY WORK
Entrance/Front door shall be made of solid oak.(special
offer aluminium entrance door)
Framework shall be made with seasoned timber. Internal
doors shall be of MDF with wood dressing (OAK). Kitchen units are to be
made of MDF with wood dressing (OAK) matt finished . .(Special offer for
Italian Kitchen and wardrobes )
ALUMINIUM
All windows and patio doors shall be of wooden color aluminium (double-glazed)
PAINT WORK
Timber frames for internal doors shall be varnished or
painted with Sadolin P65 No. 2.
Bathroom ceilings shall have spatula and gloss painted
finish.
SANITARY
WARE
A selection of first quality sanitary ware and fittings
in several colors to suit individual requirements .The maximum allowable
cost are indicated on the attached allowable table.
CENTRAL HEATING
Provision for Central Heating
PLUMBING INSTALLATION
The main water supply is from Kathikas Village and
shall be connected to a water meter.
A solar system for hot water supply includes:
1 boiler of 40 gallons with immersion heater.
1 cold water tank 1.5
M/3
1 solar panel.(imported)
Septic tank for 6 people (1.80 X 1.20 X 1.00).
Absorption pit 0.90m, 30 feet deep.
Pressure water pump
TOP SOIL
2 lorries of top soil for the garden. |